by Allison Talley | Mar 19, 2026 | Commercial
Structural CMU walls, metal bar joist ceiling, with TPO roof construction. Ample amounts of plumbing and other lines ran throughout for air, oil, and other fluids. Two story metal racking system to store tires and other material inside building. Completed our 150 day...
by Allison Talley | Mar 19, 2026 | Commercial
by Allison Talley | Mar 19, 2026 | Commercial
This project involved the ground-up construction of an approximately 8,000-square-foot Texas Roadhouse restaurant, completed on an accelerated schedule of 175 days. The scope included a full-service dining room, bar area, commercial kitchen, and associated...
by Allison Talley | Mar 18, 2026 | Commercial
This project was a small co-tenant shopping center in a high traffic volume area designed for QSR or drive through concepts. Exterior finishes are higher scale giving the project great curb appeal.
by Allison Talley | Mar 18, 2026 | Commercial